Activity Codes

Use activity codes to label shifts by work type and report on scheduled hours and costs per activity.

Activity codes are labels you create and assign to shifts on your roster. Each code has a name, a short code, and an optional colour. You can use them to tag shifts by the type of work being done, for example, Cleaning, Front of House, or Training.

Note: The Activity Codes feature is not yet available to all accounts. If you don't see the Activities option in your roster and want to use this feature, please contact support@tanda.co.


Setting up Activity Codes

To create your Activity Codes, navigate to Settings > All Settings > On-Cost Config > Activity Codes.

  1. Click + Add Activity Code.

  2. Enter a Name for the code, for example, Cleaning. This is what managers see when selecting it on the roster.

  3. Enter a short Code, for example, CLN. This appears on shift cards and in reports.

  4. Optionally, tick Assign a colour and choose a colour. The colour appears as a band on the shift card in the roster.

  5. Choose which locations, team groups and/or teams this code is for with the Applies to field.

  6. Click Create.

To edit an existing code, click its name in the list, click Edit, make your changes, and click Save.

Deactivating a code

To remove a code from future use, click Deactivate. The code is hidden from new shift selections, but all past assignments are kept, so historical reporting is not affected. Deactivated codes cannot be reactivated, but are visible when toggling the Status filter to Deactivated.


Assigning an Activity Code to a shift

Once you have set up your codes, managers can assign them to shifts directly from the roster.

  1. Go to Rosters.

  2. Click the menu icon on a shift you want to add activity codes to.

  3. Open the Activities tab in the shift detail modal.

  4. Select which code should be the default for the entire shift in the 'Unallocated time is' section. Leave this as Uncategorised if you want activity codes to apply to only part of the shift:

  5. To add codes for part of the shift, click + Add Activity on this page and set the following:

    1. The Activity Code

    2. When the code should apply: This can be done by manually setting start/end times, or by dragging the bar to the correct times


      Repeat this for as many activities as you want in the shift.

      Note that only one activity code can apply at once in a single shift. You can have multiple codes set, but they cannot overlap.

The shift will display the code's colour band at the top so you can see at a glance which work type is assigned.


Costs by Activity Code report

The Costs by Activity Code report (Reports > Costs by Activity Code) shows scheduled hours and costs broken down by each activity code.

You can filter the report by date range, location, team and category. Shifts with no activity code assigned are grouped under Uncategorised.


Importing and exporting Activity Codes

If you have a large number of codes to set up, you can import them in bulk using a CSV file.

  1. Go to Settings > All Settings > Activity Codes.

  2. Click Tools and select Import activity codes (CSV).

  3. Follow the on-screen instructions to download a template and upload your file.

To export your existing codes, click Tools and select Export activity codes (CSV).